500+ contractors trusted us with their numbers. Their win rates show it. Your competition is guessing. You shouldn't be. 500+ contractors trusted us with their numbers. Their win rates show it. Your competition is guessing. You shouldn't be.
Project Scheduling Services

Schedules
Built to Keep
Projects Moving

CPM schedules and Gantt charts that align with your estimate — planning every trade, milestone, and procurement window so your project finishes on time and on budget.

500 +
Projects Scheduled
All
Project Types
48 hr
Delivery
image

Estimate-Aligned
Project Schedules

A schedule that isn’t connected to your estimate is just a wish list. Hawks creates CPM and Gantt schedules that are built directly from your cost estimate – so durations, crew sizes, and sequencing all line up with your actual budget.

Delivered in P6, MS Project, or PDF – ready for owner submittal or internal project management.

  • CPM critical path analysis included
  • Labor and procurement windows set
  • Milestone and phasing logic mapped
  • Owner-submittable formats available
Schedule Types

The Right Schedule
for Every Project

01
icon

CPM Schedules

Critical Path Method schedules identifying the longest sequence of tasks that determines your project completion date — essential for complex commercial work.

02
icon

Gantt Charts

Visual bar chart schedules showing all project phases, durations, and overlaps — easy to read for owners, subs, and project teams alike.

03
icon

Procurement Schedules

Long-lead item tracking and material order windows so equipment, structural steel, and specialty items arrive on site before they're needed.

04
icon

Phasing Plans

Multi-phase construction sequences showing how work is organized across building areas, floors, or project segments to keep all trades productive.

05
icon

Bid Schedules

Preliminary schedules prepared specifically to support bid submissions — demonstrating your team's ability to deliver on time and per contract.

06
icon

Recovery Schedules

When a project falls behind, we build updated recovery schedules showing the path back to on-time completion — ready for owner or GC review.

Why Scheduling Matters

Schedules That Protect
Your Margins

icon

Avoid Cost Overruns

Schedule delays are the #1 cause of cost overruns. A realistic, detailed schedule prevents the cascading delays that kill project margins.

icon

Win More Bids

Owners want to know you have a plan. Submitting a professional schedule with your bid immediately sets you apart from competitors who don't.

icon

Coordinate Trades

A proper CPM schedule keeps every sub on the same page — eliminating conflicts, idle time, and the blame game that derails projects.

icon

Contract Compliance

Most commercial contracts require a CPM schedule at award. We deliver compliant schedules so you start the project on solid contractual footing.

Ready to Plan Your Next Project?

Send us your plans and project details. We'll deliver a complete schedule in 48 hours.

Get a Project Schedule →

Get a Free Quote

Tell us about your project and we'll have a sharp, detailed estimate back to you in 24–48 hours.

Estimates delivered in 24–48 hours
98% accuracy rate across all projects
All 16 CSI divisions covered
Certified estimators on every job
No commitment, no hidden fees
500+
Projects
98%
Accuracy
24hr
Turnaround

Your Details

Let us know who you are so we can connect you with the right estimator.

Project Details

Tell us about the project so we can scope the estimate accurately.

Under $500K
$500K – $2M
$2M – $10M
$10M+

Upload Your Plans

Attach your drawings or documents. We'll take it from here.

📁
Drop files here or browse
PDF, DWG, RVT, XLSX, PNG, JPG — up to 50MB per file

Request Sent!

We've received your project details and will have an estimate to you within 24–48 hours.

Name
Service
Project Type
Files Attached
Expected ReplyWithin 24–48 hrs
Step 1 of 3